Catchment 7 Drainage Improvements

Removal and/or grout fill existing storm pipe and structures. Installation of new storm piping and structures including a SAFL Baffle. Replacement of existing 18” diameter corrugated metal pipe with an 18” diameter polypropylene pipe at wooden bulkhead structure. Repaving a portion of existing streets.

 Storm Water Drainage System

The Storm Water Management/Maintenance Department is responsible for the stormwater drainage system within the Town limits. In 2017, the Town Council adopted a Stormwater Management Plan that outlined the current stormwater drainage system and the current status of the underground system. The Consultant also developed a 10-Year Stormwater Drainage Capital Improvements Plan for Council consideration during each budget process.  

The Stormwater Manager is responsible for administering the Plan.